Yes, so much that there zero were made in 2014, if the figures provided by @Pakistan Space Agency are correct.Zardari and co.It was from 2013 onwards when project picked up again.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature currently requires accessing the site using the built-in Safari browser.
Yes, so much that there zero were made in 2014, if the figures provided by @Pakistan Space Agency are correct.Zardari and co.It was from 2013 onwards when project picked up again.
Sir you can not blame all the governments. Last government's tenure added 66 jets.thanks.Corrupt governments trying to kill the project to pocket the money
Corrupt governments trying to kill the project to pocket the money
It does seem form the figures provided that the project picked up pace after 2013. The zero in 2014 could be due to cange from block-1 to block-2. You would notice in the figures provided that last block-1 was made in 2013 and first block-2 in 2015.Yes, so much that there zero were made in 2014, if the figures provided by @Pakistan Space Agency are correct.
Upgradation from blk 1 to 2.Yes, so much that there zero were made in 2014, if the figures provided by @Pakistan Space Agency are correct.
Ok, but my point was what is the reason for such significant fluctuations? If we could produce 16 in 2010, then why only 8 in '11 and then a mere 6 in '12 (only 8 in '13 aswell)?? These were all block-1 btw so no change in block either.
Why do people say the servants of the nation...nS Zardari IK and every PM since 1947 did us a favour.
Truth is whether someone likes it or not - JF17 project always gained speed during Nawaz gov. And we should give respect to the people behind this project.
Gehri bat nai samajhte log. Btw this us thunder threadWhy do people say the servants of the nation...nS Zardari IK and every PM since 1947 did us a favour.
Understand they are the servants of the poorest weakest Pakistani and it's your mindset that has turned them into our rulers.
The JF-17 Crash in 2011 slowed down the production as they had to re-evaluate and fix certain things in JF-17 once again i.e Wing Strengthening . Also PAF is on record saying, That it was cash strapped and lot of projects were slowed down in 2010-2013 period.
If this is correct, why so much fluctuation in Production? 16 in 2010 to only 6-8 in 2011 till 2013 , and zero in 2014?? And again 22 in 2017 and then only 5 in 2018 and 2019??
BTW, did you mean 1x602B has no pictorial confirmation? (you wrote 1x603B)
Per paf book nothing of the sort Was mentioned except some block 1 production was delayed to Expedite the transfer of technology and manufacturing of parts plus lastly adding vertical stabilizer in the work share
The bowel movements of quite a few people saw improvement when the Sharifs were in government. Would you like us to respect them for this too?
Truth is whether someone likes it or not - JF17 project always gained speed during Nawaz gov. And we should give respect to the people behind this project.
Truth is whether someone likes it or not - JF17 project always gained speed during Nawaz gov. And we should give respect to the people behind this project.
75 F-16/J10-C could be a much better option instead of 150 plus mediocre JF-17.