do we have any long range SAMs defending this site??? If not we really need to get some![]()
The sites are adequately defended for sure, but some types of attack cannot be prevented.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature currently requires accessing the site using the built-in Safari browser.
do we have any long range SAMs defending this site??? If not we really need to get some![]()
1000MW ??? or same as old 300MW !!!!
1000MW ??? or same as old 300MW !!!!
If you are referring to ArsalanAhmed's post... he is talking about 1000MW plant which i believe will be installed in Karachi.... and will remain for peaceful purposes (electricity generation only) and under the IAEA safeguard
If you are referring to the first post...that is third reactor being installed in Khushab and will support Pakistan's Nuclear weapon's program...so its exact capacity will remain unknown.
Nope, not the old 300MW design. This is a new design with about 1000MW power generation output.

Karachi is NOT the correct place to site such a big NPP. This unit will either go to Chashma, or another new site.
sir as per my info the power generation of this reactor also is 300MW.
the total production of the complex will reach about 1000 MW once all three are completed.
as Sir Arsalan have said, there were report that a new 1000MW project is on card.
hope this happens soon
the short fall have reached 5000MW as of today!
![]()
There is a land purchased in Karachi couple of months/years ago in order to accomodate Nuclear reactors in future. By the way, There is already one Nuclear reactor in Karachi operational since 1970s and is scheduled to be retired by next year.
1000MW ??? or same as old 300MW !!!!
Nope, not the old 300MW design. This is a new design with about 1000MW power generation output.
sir as per my info the power generation of this reactor also is 300MW.
the total production of the complex will reach about 1000 MW once all three are completed.
as Sir Arsalan have said, there were report that a new 1000MW project is on card.
hope this happens soon
the short fall have reached 5000MW as of today!
![]()
China does have a large NPP design, bigger than the standard 900MW French design, with several significant changes. The problem for Pakistan will be to finance such a large project.
CHASNUPP was originally designed to have 3x300MW units, with provisions for two to three more if needed. The issue with that site now is the cooling water supply since the hydrology of the Indus Basin has changed quite a lot since the project was started.

and sorry there is no concrete evidence to prove its generation capacityKANUPP is only 150 MW, and was sited when Karachi was much smaller and the regulatory environment and security concerns very different.
Better sites are available with better securtiy and cooling water supply than whatever land has been acquired, which can be used for other purposes.

sir as per my info the power generation of this reactor also is 300MW.
the total production of the complex will reach about 1000 MW once all three are completed.
as Sir Arsalan have said, there were report that a new 1000MW project is on card.
hope this happens soon
the short fall have reached 5000MW as of today!
![]()
why they are crying,
is this illegal ?